Kitchen Remodeling Contractors in Dallas, TX

We design and build kitchens for Dallas homeowners — from a cabinet-and-countertop refresh to taking the wall out and starting again. One contract, one project manager, a fixed price agreed before demo day.

What a kitchen remodel in Dallas actually involves

A kitchen is the most complicated room in a house to renovate. It's the only one where plumbing, gas, electrical, ventilation, cabinetry, stone fabrication and flooring all have to land in the right order, to the millimetre, while you're still living there.

That sequencing is the job. Cabinets can't be ordered until the layout is final. Stone can't be templated until the cabinets are set. Appliances can't be fitted until the stone is in. Miss one hand-off and the whole schedule slips by three weeks, which is where most of the horror stories in this trade come from.

We run design and construction as one contract so those hand-offs are ours to manage, not yours. You get one project manager, a written schedule, and a price that's fixed before anything is torn out.

Where we typically start

Most of the kitchens we're asked about in Dallas fall into one of three situations:

  • The layout is fine, the finishes are dated. Cabinet boxes are solid, the work triangle works. Refacing or new doors plus new countertops gets you a new kitchen for a fraction of a gut.
  • The layout is the problem. A wall between the kitchen and living room, a peninsula where an island should be, a fridge that blocks a doorway. This is a full remodel, and it's the one that changes how the house lives.
  • The house is new to you. You've just bought and want the kitchen done before you move in. Fastest, cleanest and cheapest way to do it — no temporary kitchen, no dust barriers, no living around a job site.
Modern island kitchen remodel in Dallas

Request a free estimate

Tell us about the project and we'll come out to Dallas to measure.

We reply within one business day. Your details are never sold or shared.

What a kitchen remodel costs in Dallas

Cost is the first question everyone has and the one most contractors dodge. Here's the honest version: the price is driven by three things, in this order — whether the layout changes, the cabinetry, and the stone. Appliances and tile matter far less than people expect.

ProjectTypical range in DallasWhat drives it
Countertop replacement only$4,000 – $15,000Slab material, square footage, edge detail, sink cut-outs
Cabinet refacing$6,500 – $15,000Door style and finish, number of openings, hardware
Kitchen remodel, same layout$32,000 – $55,000Cabinet grade, countertop material, flooring, lighting
Kitchen remodel, layout changed$55,000 – $95,000Wall removal, beam, plumbing and electrical relocation
Luxury / custom kitchen$95,000+Custom inset cabinetry, natural stone, panel-ready appliances, millwork

Three cost drivers people consistently underestimate:

  • Moving the sink or range. Relocating plumbing or gas more than a few feet means opening the slab or the ceiling below. In Dallas's slab-on-grade houses that's a real line item, not a rounding error.
  • Cabinet grade. The gap between stock, semi-custom and full custom cabinetry is the single biggest swing in any kitchen budget — often more than every appliance combined.
  • Whatever's behind the wall. Older houses hide things. We budget a contingency for it up front and tell you what we find, rather than discovering it on week three and handing you a change order.

Your proposal is a fixed price against a written scope. If we hit something genuinely unforeseen behind a wall, you see the cost and approve it before we touch it.

Permits and inspections

Cosmetic work doesn't need a permit. Cabinets, countertops, backsplash, flooring, paint and swapping a fixture for a like-for-like fixture are all fine as-is.

You do need a permit — and we pull it — when the project involves:

  • Removing or altering a wall, load-bearing or not
  • Moving or adding plumbing supply and drain lines
  • New electrical circuits, a panel change, or moving the range circuit
  • Gas line work of any kind
  • Changing or adding a window or exterior door
  • Adding or relocating a range hood that vents outside

We handle the application, the drawings, and the inspection scheduling with the City of Dallas. It's built into the timeline we give you, not an afterthought that stalls the job. Working without a permit on structural or gas work is a problem you inherit at resale, when the buyer's inspector asks for paperwork that doesn't exist.

How long a kitchen remodel takes

The honest answer is that the build is the short part. Design, selections and lead times take longer than the construction does, and that's the phase people are surprised by.

PhaseTypical durationWhat's happening
Consultation & measure1 weekSite visit, measurements, budget conversation
Design & selections3 – 6 weeksLayout drawings, 3D views, cabinet and stone selections, final scope
Ordering & lead time4 – 10 weeksCabinetry built, appliances secured, tile and fixtures delivered
Demo & rough-in1 – 2 weeksTear-out, framing, plumbing, electrical, inspections
Install3 – 5 weeksCabinets set, stone templated and fitted, tile, flooring, paint
Finish & walkthrough1 weekAppliances, hardware, punch list, final clean

Custom cabinetry is almost always the long pole. If your timeline is tight, tell us on day one — there are real ways to compress it, and choosing the cabinet line early is the biggest one.

Living through it

You can stay in the house for a kitchen remodel and most of our clients do. What makes it bearable is preparation rather than optimism:

  • We build dust barriers with zipper doors and run negative air, so drywall dust doesn't end up in your bedrooms.
  • Floors and walkways between the entry and the kitchen are protected for the whole job.
  • We'll set up a temporary kitchen — fridge, microwave, kettle and a working sink somewhere else in the house — before demo starts.
  • The site is swept and tools are put away at the end of every day. You get your house back each evening.
  • You get a schedule showing which trade is in the house on which days, so there are no surprise 7am knocks.
How we work

One team, five steps, no surprises

Most remodels go wrong in the gaps — between the drawing and the build, between one trade leaving and the next arriving. We run design and construction under one contract so there are no gaps to fall into.

Free consultation
01

Free consultation

We come to your home, measure, and talk through what's working and what isn't. No charge, no obligation.

Design & selections
02

Design & selections

Layout drawings, 3D views and a materials list, so you see the finished room before you commit.

Fixed-price proposal
03

Fixed-price proposal

A line-item scope and a written schedule. You know the number before anything is torn out.

Build
04

Build

One crew, one project manager, a locked schedule and daily site clean-down.

Walkthrough
05

Walkthrough

We walk the finished space together, list anything that isn't right, and fix it before you pay the balance.

Where we work

Kitchen remodeling across Dallas–Fort Worth

We work throughout Dallas and the wider Dallas–Fort Worth area. Below is where we run projects most often — call us if your neighborhood isn't listed.

Carrollton
Farmers Branch
Garland
Irving
Mesquite
Rowlett
Rockwall
Allen
McKinney
Lewisville
Grand Prairie
Arlington
Bluffview
Dallas County
Reviews

What Dallas homeowners say

Every review below is a real Google review from a completed project.

★★★★★

Google review — pulled in at launch

Customer nameNeighborhood
★★★★★

Google review — pulled in at launch

Customer nameNeighborhood
★★★★★

Google review — pulled in at launch

Customer nameNeighborhood
Read all reviews
Questions

Frequently asked questions

Not with us — design and build are the same contract. That matters more than it sounds. When the designer and builder are separate companies, anything that doesn't work on site becomes an argument about whose fault it is, and you're the one refereeing. Here, if the drawing doesn't build, that's ours to solve.
Yes, and we do it regularly. Bring us the drawings and we'll price and build them. We'll also flag anything we think will cause problems on site before you commit — better to have that conversation at the drawing stage than at framing.
Yes. A large share of the kitchens we look at have solid cabinet boxes and a layout that works, and the owners are about to spend three times what they need to. If refacing and new countertops gets you where you want to be, we'll say so. We'd rather do the smaller job well and be the people you call for the bathroom next year.
Call us and we come back. Every project gets a walkthrough where we build a punch list together, and nothing is signed off until that list is closed. Workmanship issues that show up later are ours to fix; manufacturer warranties on cabinetry, stone and appliances are passed through to you in writing at handover.
A deposit to book the slot and start the design, then progress payments tied to milestones that have actually been reached — not to dates on a calendar. The final payment is due after the walkthrough punch list is closed, not before.
Start your project

Let's talk about your kitchen remodeling.

Every project starts with a free in-home consultation. We measure, talk through layout and materials, and follow up with a written fixed-price proposal — no obligation, no pressure.