When the project is bigger than one room — a newly bought house, a dated floor plan, or a renovation you'd rather do once — we run the whole thing under a single contract and a single schedule.
Why doing it once costs less than doing it three times
Renovating a house room by room over several years feels financially safer. It usually isn't. Every project restarts the same fixed costs — mobilisation, dust protection, permits, design, the disruption of living through it — and finishes drift as product lines change, so the house ends up looking assembled rather than designed.
Running the work as one project means one design language, one permit package, one set of trades sequenced efficiently, and one period of disruption instead of four. On a house where you're touching a kitchen, two bathrooms and the flooring, that consolidation is usually worth 10 to 20 percent against the same scope done piecemeal.
The projects this covers
Whole-home work tends to be one of these:
- A house you've just bought. Everything done before you move in — the fastest and least painful version of a renovation, with no temporary kitchen and no living around a job site.
- Opening up a closed floor plan. Removing walls between kitchen, dining and living, engineering the beams, and rebuilding as one space.
- A staged renovation of a house you're staying in. Same contract, sequenced so you always have a working kitchen or bathroom somewhere.
- Preparing a house for sale. Focused on the rooms that move an offer — kitchen, primary bath, flooring and paint.
Request a free estimate
Tell us about the project and we'll come out to Dallas to measure.
Whole-home services
Most whole-home projects combine several of these. One contract, one project manager, one schedule across all of them.
Whole-home renovation
Back-to-studs and major renovations, sequenced as one project.
Learn moreHome additions
Room additions, kitchen extensions, primary suites and second storeys.
Learn moreKitchen & bath packages
Both rooms under one contract, one design language and one period of disruption.
Learn moreWhat whole-home renovation costs
Whole-home budgets are best understood per square metre of what you're actually touching, not the total floor area of the house. A "full renovation" that leaves three bedrooms alone is a very different number from one that doesn't.
| Scope | Typical range in Dallas | Notes |
|---|---|---|
| Cosmetic refresh (paint, flooring, fixtures) | $30,000 – $70,000 | No layout or structural change |
| Kitchen + primary bath together | $55,000 – $95,000 | The most common combination we run |
| Major renovation, layout changed | $120,000 – $300,000 | Wall removal, beams, plumbing and electrical reconfiguration |
| Full gut renovation | $300,000+ | Back to studs, new services throughout |
Older houses carry more risk of the unexpected — outdated wiring, cast iron drains at the end of their life, foundation movement, or the previous owner's undocumented work. We build a contingency into the proposal and tell you what we find as we find it, rather than presenting it as a change order after the fact.
Structural work and wall removal
Opening a floor plan is the change that most alters how a house lives, and the one with the most behind it:
- We establish whether a wall is load-bearing early — from framing direction, span, and what's above it — not on demo day.
- Load-bearing walls need an engineer's beam specification and a permit. We handle both.
- Whatever lives in the wall gets rerouted: plumbing stacks, HVAC ducts, electrical runs. This is the item that most often changes a budget.
- Temporary shoring supports the structure while the beam goes in.
- Ceiling and floor make-good across the old wall line is planned rather than patched, so there's no visible scar where the wall used to be.
Sequencing, and living through it
On a whole-home project the order of operations is most of the value we add. Rough sequence:
| Stage | What happens | Typical duration |
|---|---|---|
| Design & permits | Drawings, engineering, selections, permit approval | 6 – 12 weeks |
| Demo & structural | Tear-out, beams, framing changes | 2 – 4 weeks |
| Rough-in | Plumbing, electrical, HVAC, inspections | 2 – 4 weeks |
| Close-up | Insulation, drywall, tape and finish | 2 – 3 weeks |
| Finishes | Cabinetry, tile, flooring, paint, trim | 4 – 8 weeks |
| Fit-out & punch | Fixtures, appliances, hardware, walkthrough | 1 – 2 weeks |
For a full gut, moving out is usually the right call and often cheaper overall, because the trades can work continuously instead of around you. We'll tell you honestly which weeks are liveable and which aren't.
Recent home remodeling projects
One team, five steps, no surprises
Most remodels go wrong in the gaps — between the drawing and the build, between one trade leaving and the next arriving. We run design and construction under one contract so there are no gaps to fall into.
Free consultation
We come to your home, measure, and talk through what's working and what isn't. No charge, no obligation.
Design & selections
Layout drawings, 3D views and a materials list, so you see the finished room before you commit.
Fixed-price proposal
A line-item scope and a written schedule. You know the number before anything is torn out.
Build
One crew, one project manager, a locked schedule and daily site clean-down.
Walkthrough
We walk the finished space together, list anything that isn't right, and fix it before you pay the balance.
Home remodeling across Dallas–Fort Worth
We work throughout Dallas and the wider Dallas–Fort Worth area. Below is where we run projects most often — call us if your neighborhood isn't listed.
What Dallas homeowners say
Every review below is a real Google review from a completed project.
Google review — pulled in at launch
Google review — pulled in at launch